Gia Thuan 2 Industrial Cluster

50 ha
Total scale

39 ha
Industrial land

50 years
Operating time
Roadway

From Gia Thuan 2 Industrial Cluster:
-
Away from Go Cong town13km
-
How to get to District 8 Bus Station (HCMC)40km
-
Distance from Long An International Port40km
-
Distance from My Tho City50km
-
Far from Tan Son Nhat Airport65km
-
Far from Cat Lai Port70km
Waterway

From Gia Thuan 2 Industrial Cluster:
-
Distance from Long An International Port10km
-
Distance from Hiep Phuoc Port:20km
-
Far from Cat Lai Port30km
-
Far from Cai Mep Port50km
-
Far from My Tho Port70km
The infrastructure
Power supply
The National Power Grid meets standard 11TCVN18-2006, voltage level 22KV.
Water supply
The water supply system meets TCXDVN 33: 2006 standards, capacity of 3,000m3/day and night.
Communication systems
The communication system (telephone, internet connection, cable TV…) is guaranteed to be smooth and will be connected to functional areas in the industrial cluster.
Waste water treatment system
Wastewater treatment plant with operating capacity of 1,845m3/day and night.
Internal road system
Cement concrete road is designed according to VN H18-H30 standards, including 3 routes:
- Road No. 01: Road width 15.5m
- Road No. 02: Road width 21m
- Road No. 03: Road width 15.5m
- Road No. 04: Road width 19m
TICCO industrial service center
Always ready to support investors.